Design | Manufacture | Build | Management
Structure (200mm):
50mm – Precast concrete slab
150mm – Concrete poured on site.
Precast monolithic slabs are quickly and efficiently assembled because they are made of premanufactured elements. This allows for reduced construction time and increased project efficiency.
Elements manufactured in the factory meet high-quality standards, as they can be produced under controlled conditions.
Structure (200mm):
55mm – Prefabricated part
90mm – Concrete poured on site.
55mm – Prefabricated part
Walls are composite reinforced concrete walls consisting of two precast reinforced concrete layers connected with a dovetail system.
This type of wall follows the design principles of conventional monolithic reinforced concrete walls.
Structure (200mm):
60mm – Prefabricated part
80mm – PUR insulation
60mm – Prefabricated part
Walls can be conveniently made with thermal insulation layer insde.
Engineering systems are conveniently installed together with structures, which saves 30% of the installation time.
Engineering systems are pre-installed in the structures, which saves 40% of the total installation time.
It is possible to pre-install electricity, data cables, pipes, openings for air ducts etc. easily, thus on site assembly is clean and efficient process.
COMPARISON. SLABS
HELSTOMM floor slab (250 mm) |
In-Situ concrete slab (250mm) |
|
---|---|---|
Construction | ||
Time costs | ||
Transportation |
HELSTOMM floor slab vs
In-Situ concrete:
Composite filigree floor slab can save up to 10%-15% of project costs vs In-Situ concrete slab. If Prefabricated products factory is built near the real estate construction area, Composite filigree floor slab can save up to 15-20% costs, compared to In-Situ solution.
COMPARISON. SANDWICH WALLS
HELSTOMM sandwich wall (200 mm) (with PUR insulation |
Sandwich wall (310mm) (with EPS insulation |
Insulated concrete block (200mm) (with EPS insulation |
|
---|---|---|---|
Construction |
U=0,300 (W/m2*K) |
U=0,300 (W/m2*K) |
U=0,593 (W/m2*K) |
Time costs |
COMPARISON. WALLS
HELSTOMM wall (200 mm) |
Solid wall (200mm | In-Situ concrete wall (200mm) |
|
---|---|---|---|
Construction | |||
Time costs | |||
Transportation |
Combined filigree wall
vs
Solid wall/ In-Situ concrete wall
Combined filigree wall can save up to 15%-20% of project costs vs Solid wall / In-Situ concrete wall.
If prefabricated products factory is built near the real estate construction area, Composite filigree wall can save up to 20-25% costs, compared to solid/ In-Situ solution.
FACADE EXAMPLES
High quality final surface of the concrete elements (walls, slabs).
Endless facade possibilities available.
No additional finishing needed.
RELEVANT CONSTRUCTION SYSTEM SOLUTION
Combined solutions of prefabricated (factory made) and cast-in-place reinforced concrete constructions (such as – lattice girder slab, double wall, beams, balcony slabs) makes a convenient and efficient system, which saves time and project costs.
Experience
With over 15 years of experience in construction, real estate development, and design management, our extensive expertise encompasses concrete manufacturing, the construction industry, and a diverse range of Design-to-build services tailored to meet the unique needs of each project.
With a proficient team that includes specialists in concrete manufacture, construction, design, and project management, we ensure that every aspect of our partner is handled with utmost professionalism and expertise.
We are prepared to deliver reliable projects from start to finish, and our knowledge and skills allow us to do so efficiently.
Structural Design
- Stability calculation
- Prefab concrete, In-Situ concrete design
- Workshop drawings
- BIM Modelling for Streamlined Project Processes
Manufacture of Precast Concrete Products
- Efficient Management of Production Processes
- Wide range of prefabricated concrete products such as floors, bearing wall, sandwich walls, balcony, beams.
Construction
- Project Planning, Coordination, and Supervision
- Contractor and Subcontractor Selection
- Quality Control and Technical Construction Regulations Compliance
- Timely and Efficient Project Execution
Projects Managment
- Full-Service Solutions from Design to Completion
- Handling all Stages, Ensuring Smooth Project Execution
Contact Us
UAB “Helstomm Group”
Address: King Abdullah Road P.O Box:4020 Riyadh,Saudi Arabia
Phone: +370 68615499
E-mail: info@helstomm.com